Author | Topic: 'S' Stock build commences (Read 3,708 times) |
rob chatter member is online
![[avatar] [avatar]](http://upload.wikimedia.org/wikipedia/commons/thumb/7/7e/Heritage_Routemaster.jpg/250px-Heritage_Routemaster.jpg)
hop on, hop off. The way it should be.
Joined: Jun 2006 Gender: Male  Posts: 1,099 Location: North London
|  | Re: 'S' Stock build commences « Reply #15 on Apr 6, 2008, 8:20pm » | |
Quote:| Slightly OT: Do they really pronounce it Bom-bar-dee-ay, and do you go along with this nonsense? |
|
Yup, it's pronounced like that. It's a Canadian (french) company that took over Adtranz, who took over ABB who originally purchased BREL in 1989.
| |
|
prjb member is offline
![[avatar] [avatar]](http://i80.photobucket.com/albums/j172/p1314/prjbav.jpg)
We move customers from A to B, sometimes we do it via 'C'!
Joined: Mar 2006 Gender: Male  Posts: 1,617 Location: London
|  | Re: 'S' Stock build commences « Reply #16 on Apr 6, 2008, 8:41pm » | |
Quote:PRJB Do you work for Bombardier or something? I would love to have a first hand look at how trains are built! |
|
No mate, I am LU all the way! 
I work in upgrades (after a reasonably lengthy life in operations) and am responsible for ensuring that the design meets end user requirements.
|
Cry God for Harry, England, and St George! |
|
prjb member is offline
![[avatar] [avatar]](http://i80.photobucket.com/albums/j172/p1314/prjbav.jpg)
We move customers from A to B, sometimes we do it via 'C'!
Joined: Mar 2006 Gender: Male  Posts: 1,617 Location: London
|  | Re: 'S' Stock build commences « Reply #17 on Apr 9, 2008, 6:48pm » | |
As promised, an update on 'S' Stock production:
The first driving motor car (21001) is fully constructed and on it's bogies. The doors are fitted and the cab has all of it's control panels/switches etc. In addition the drivers temporary desk and the instructors desk are in place, but the cab still requires some fit out (panels/facias etc). The saloon has very little fitted at the moment apart from the flooring, and it is still awaiting seats.
There are a another two cars constructed (which I was able to walk around) but without doors/bogies etc, and further two cars in a less advanced state with looms being fitted.
The driving motor car is due to go into the lab for testing in around a weeks time and the program in general is approximately 3 weeks behind schedule following the first driving motor car (21002) suffering an accident.
This brings you guys up to speed with the current state of the 'S' Stock. I know you are eagerly awaiting images, I haven't forgotten you, but this will take a little while longer yet (due to politics etc).
|
Cry God for Harry, England, and St George! |
|
100andthirty member is offline
Joined: Mar 2007 Posts: 224
|  | Re: 'S' Stock build commences « Reply #18 on Apr 27, 2008, 8:59pm » | |
In case anyone sees May Modern Railways there's a short section on page 6 with out of date info about S stock. It's wrong and production is full steam (well, electricity) ahead!
| |
|
maxtube Guest
|  | Re: 'S' Stock build commences « Reply #19 on May 20, 2008, 3:56pm » | |
Cool to see the S stock coming! I'm not very fond about the 67 stock being replaced, although I still like 2009 stock, but the S stock looks great!
| |
|
prjb member is offline
![[avatar] [avatar]](http://i80.photobucket.com/albums/j172/p1314/prjbav.jpg)
We move customers from A to B, sometimes we do it via 'C'!
Joined: Mar 2006 Gender: Male  Posts: 1,617 Location: London
|  | Re: 'S' Stock build commences « Reply #20 on May 21, 2008, 8:54pm » | |
Just to update you all, again! There are now all eight cars of train 1 in production and two cars of train 2 also in the early stages of construction.
|
Cry God for Harry, England, and St George! |
|
tubeprune Founder
     member is offline
Joined: Aug 2006 Gender: Male  Posts: 1,279 Location: Loughborough, England
|  | Re: 'S' Stock build commences « Reply #21 on May 22, 2008, 11:51am » | |
Modern Railways report (June issue) that the plan to lengthen the new 6-car trains on the H & C to 7-cars will be shelved until after the 2012 Olympics. They also suggest that S6s will be built before the Metropolitan stock. This means that the A Stock will continue to run after the C Stock has been replaced. It also says that the new Metropolitan stock will be delivered as 7-car trains, “with a car added later after infrastructure improvements”. Mmmm. That will put some cats amongst the pigeons north of Wembley Park.
prjb - over to you.
|
"Rules are for the guidance of wise men and the observance of fools" |
|
Jim member is offline
![[avatar] [avatar]](http://img.photobucket.com/albums/v109/Motorman/Paper-Men.gif)
Joined: Feb 2005 Gender: Male  Posts: 2,117 Location: WB-EB-WB-EB-Home
|  | Re: 'S' Stock build commences « Reply #22 on May 22, 2008, 3:01pm » | |
As I previously posted I thought the S7 project on the Circle & Hammersmith was a stupid idea due to the trains not fitting in most platforms and sidings on the line. Now hopefully someone has seen sense and shelved the idea.
|
District Line Driver based at Upminster. The posh end of the District. |
|
astock5000 member is offline
![[avatar] [avatar]](http://i293.photobucket.com/albums/mm67/astock5000/IMG_5555A.jpg)
A60 stock DM 5000 at Harrow on the Hill.
Joined: Mar 2008 Gender: Male  Posts: 1,677 Location: Garston, Hertfordshire
|  | Re: 'S' Stock build commences « Reply #23 on May 22, 2008, 4:34pm » | |
Quote:| the plan to lengthen the new 6-car trains on the H & C to 7-cars will be shelved until after the 2012 Olympics. |
|
What about the Circle?
Quote:| They also suggest that S6s will be built before the Metropolitan stock. This means that the A Stock will continue to run after the C Stock has been replaced. |
|
I hope that happens, but I think that the Met. will get their S stock first.
Quote:| It also says that the new Metropolitan stock will be delivered as 7-car trains, “with a car added later after infrastructure improvements”. |
|
What infrastructure improvements. Met. platforms are long enough. If this was true, why would S stock train 1 be 8 car?
|
|
|
astock5000 member is offline
![[avatar] [avatar]](http://i293.photobucket.com/albums/mm67/astock5000/IMG_5555A.jpg)
A60 stock DM 5000 at Harrow on the Hill.
Joined: Mar 2008 Gender: Male  Posts: 1,677 Location: Garston, Hertfordshire
|  | Re: 'S' Stock build commences « Reply #24 on May 22, 2008, 4:36pm » | |
May 20, 2008, 3:56pm, maxtube wrote: I don't like the S stock design, the window in the end door is too low, and couldn't they put the grey across the door? (And also on the 09TS).
|
|
|
Jim member is offline
![[avatar] [avatar]](http://img.photobucket.com/albums/v109/Motorman/Paper-Men.gif)
Joined: Feb 2005 Gender: Male  Posts: 2,117 Location: WB-EB-WB-EB-Home
|  | Re: 'S' Stock build commences « Reply #25 on May 22, 2008, 5:28pm » | |
May 22, 2008, 4:34pm, astock5000 wrote:The Circle and H&C are one line in timetabling, crewing and trains. So any decision regarding the H&C also applies to the Circle.
|
District Line Driver based at Upminster. The posh end of the District. |
|
metman chatter member is offline
![[avatar] [avatar]](http://i100.photobucket.com/albums/m6/Adthelad/DSCN0633.jpg)
A60 stock car 5057
Joined: Oct 2007 Gender: Male  Posts: 2,973 Location: Northwood-on the Met main line
|  | Re: 'S' Stock build commences « Reply #26 on May 22, 2008, 5:48pm » | |
The Circle/Hammersmith & City needs the trains more than the Met. With the signalling delayed the Met doesn't want fewer seats in the short/med term!
|
I love my A stock I do! |
|
astock5000 member is offline
![[avatar] [avatar]](http://i293.photobucket.com/albums/mm67/astock5000/IMG_5555A.jpg)
A60 stock DM 5000 at Harrow on the Hill.
Joined: Mar 2008 Gender: Male  Posts: 1,677 Location: Garston, Hertfordshire
|  | Re: 'S' Stock build commences « Reply #27 on May 22, 2008, 6:27pm » | |
May 22, 2008, 5:28pm, Jim wrote: May 22, 2008, 4:34pm, astock5000 wrote:The Circle and H&C are one line in timetabling, crewing and trains. So any decision regarding the H&C also applies to the Circle. |
|
That's what I thought, but couldn't the Circle be run as part of the District? It wasn't always run with the H&C.
|
|
|
Jim member is offline
![[avatar] [avatar]](http://img.photobucket.com/albums/v109/Motorman/Paper-Men.gif)
Joined: Feb 2005 Gender: Male  Posts: 2,117 Location: WB-EB-WB-EB-Home
|  | Re: 'S' Stock build commences « Reply #28 on May 22, 2008, 7:47pm » | |
May 22, 2008, 6:27pm, astock5000 wrote: May 22, 2008, 5:28pm, Jim wrote:| The Circle and H&C are one line in timetabling, crewing and trains. So any decision regarding the H&C also applies to the Circle. |
|
That's what I thought, but couldn't the Circle be run as part of the District? It wasn't always run with the H&C. |
| It could be, but the District would need more drivers, all drivers would need road training on the north side of the Circle and the H&C to Hammersmith as most trains end up at Hammersmith Depot, all drivers would need C stock training (currently, East end drivers don't work C stock). All this costs money.
|
District Line Driver based at Upminster. The posh end of the District. |
|
metman chatter member is offline
![[avatar] [avatar]](http://i100.photobucket.com/albums/m6/Adthelad/DSCN0633.jpg)
A60 stock car 5057
Joined: Oct 2007 Gender: Male  Posts: 2,973 Location: Northwood-on the Met main line
|  | Re: 'S' Stock build commences « Reply #29 on May 22, 2008, 8:41pm » | |
It is best that the H&C and Circle stay combined!
|
I love my A stock I do! |
|
|