 AuthorTopic: 'S' Stock build commences (Read 3,708 times)
rob
chatter
member is online

[avatar]

hop on, hop off. The way it should be.



Joined: Jun 2006
Gender: Male
Posts: 1,099
Location: North London
 Re: 'S' Stock build commences
« Reply #15 on Apr 6, 2008, 8:20pm »


Quote:
Slightly OT: Do they really pronounce it Bom-bar-dee-ay, and do you go along with this nonsense?


Yup, it's pronounced like that. It's a Canadian (french) company that took over Adtranz, who took over ABB who originally purchased BREL in 1989.
Link to Post - Back to Top  IP: Logged
prjb

member is offline

[avatar]

We move customers from A to B, sometimes we do it via 'C'!



Joined: Mar 2006
Gender: Male
Posts: 1,617
Location: London
 Re: 'S' Stock build commences
« Reply #16 on Apr 6, 2008, 8:41pm »


Quote:
PRJB
Do you work for Bombardier or something? I would love to have a first hand look at how trains are built!


No mate, I am LU all the way! ;)

I work in upgrades (after a reasonably lengthy life in operations) and am responsible for ensuring that the design meets end user requirements.
Link to Post - Back to Top  IP: Logged

Cry God for Harry, England, and St George!
prjb

member is offline

[avatar]

We move customers from A to B, sometimes we do it via 'C'!



Joined: Mar 2006
Gender: Male
Posts: 1,617
Location: London
 Re: 'S' Stock build commences
« Reply #17 on Apr 9, 2008, 6:48pm »

As promised, an update on 'S' Stock production:

The first driving motor car (21001) is fully constructed and on it's bogies. The doors are fitted and the cab has all of it's control panels/switches etc. In addition the drivers temporary desk and the instructors desk are in place, but the cab still requires some fit out (panels/facias etc). The saloon has very little fitted at the moment apart from the flooring, and it is still awaiting seats.

There are a another two cars constructed (which I was able to walk around) but without doors/bogies etc, and further two cars in a less advanced state with looms being fitted.

The driving motor car is due to go into the lab for testing in around a weeks time and the program in general is approximately 3 weeks behind schedule following the first driving motor car (21002) suffering an accident.

This brings you guys up to speed with the current state of the 'S' Stock. I know you are eagerly awaiting images, I haven't forgotten you, but this will take a little while longer yet (due to politics etc).
Link to Post - Back to Top  IP: Logged

Cry God for Harry, England, and St George!
100andthirty

member is offline





Joined: Mar 2007
Posts: 224
 Re: 'S' Stock build commences
« Reply #18 on Apr 27, 2008, 8:59pm »

In case anyone sees May Modern Railways there's a short section on page 6 with out of date info about S stock. It's wrong and production is full steam (well, electricity) ahead!
Link to Post - Back to Top  IP: Logged
maxtube
Guest
 Re: 'S' Stock build commences
« Reply #19 on May 20, 2008, 3:56pm »

Cool to see the S stock coming! I'm not very fond about the 67 stock being replaced, although I still like 2009 stock, but the S stock looks great!
Link to Post - Back to Top  IP: Logged
prjb

member is offline

[avatar]

We move customers from A to B, sometimes we do it via 'C'!



Joined: Mar 2006
Gender: Male
Posts: 1,617
Location: London
 Re: 'S' Stock build commences
« Reply #20 on May 21, 2008, 8:54pm »

Just to update you all, again! There are now all eight cars of train 1 in production and two cars of train 2 also in the early stages of construction.
Link to Post - Back to Top  IP: Logged

Cry God for Harry, England, and St George!
tubeprune
Founder
*****
member is offline





Joined: Aug 2006
Gender: Male
Posts: 1,279
Location: Loughborough, England
 Re: 'S' Stock build commences
« Reply #21 on May 22, 2008, 11:51am »

Modern Railways report (June issue) that the plan to lengthen the new 6-car trains on the H & C to 7-cars will be shelved until after the 2012 Olympics. They also suggest that S6s will be built before the Metropolitan stock. This means that the A Stock will continue to run after the C Stock has been replaced. It also says that the new Metropolitan stock will be delivered as 7-car trains, “with a car added later after infrastructure improvements”. Mmmm. That will put some cats amongst the pigeons north of Wembley Park.

prjb - over to you.
« Last Edit: May 22, 2008, 11:53am by tubeprune »Link to Post - Back to Top  IP: Logged

"Rules are for the guidance of wise men and the observance of fools"
Jim

member is offline

[avatar]



Joined: Feb 2005
Gender: Male
Posts: 2,117
Location: WB-EB-WB-EB-Home
 Re: 'S' Stock build commences
« Reply #22 on May 22, 2008, 3:01pm »

As I previously posted I thought the S7 project on the Circle & Hammersmith was a stupid idea due to the trains not fitting in most platforms and sidings on the line. Now hopefully someone has seen sense and shelved the idea.
Link to Post - Back to Top  IP: Logged

District Line Driver based at Upminster. The posh end of the District.
astock5000
member is offline

[avatar]

A60 stock DM 5000 at Harrow on the Hill.



Joined: Mar 2008
Gender: Male
Posts: 1,677
Location: Garston, Hertfordshire
 Re: 'S' Stock build commences
« Reply #23 on May 22, 2008, 4:34pm »


Quote:
the plan to lengthen the new 6-car trains on the H & C to 7-cars will be shelved until after the 2012 Olympics.

What about the Circle?

Quote:
They also suggest that S6s will be built before the Metropolitan stock. This means that the A Stock will continue to run after the C Stock has been replaced.

I hope that happens, but I think that the Met. will get their S stock first.

Quote:
It also says that the new Metropolitan stock will be delivered as 7-car trains, “with a car added later after infrastructure improvements”.

What infrastructure improvements. Met. platforms are long enough. If this was true, why would S stock train 1 be 8 car?
Link to Post - Back to Top  IP: Logged

A stock - The best trains on LU (in my opinion).

http://www.youtube.com/astock5000
astock5000
member is offline

[avatar]

A60 stock DM 5000 at Harrow on the Hill.



Joined: Mar 2008
Gender: Male
Posts: 1,677
Location: Garston, Hertfordshire
 Re: 'S' Stock build commences
« Reply #24 on May 22, 2008, 4:36pm »


May 20, 2008, 3:56pm, maxtube wrote:
the S stock looks great!

I don't like the S stock design, the window in the end door is too low, and couldn't they put the grey across the door? (And also on the 09TS).
Link to Post - Back to Top  IP: Logged

A stock - The best trains on LU (in my opinion).

http://www.youtube.com/astock5000
Jim

member is offline

[avatar]



Joined: Feb 2005
Gender: Male
Posts: 2,117
Location: WB-EB-WB-EB-Home
 Re: 'S' Stock build commences
« Reply #25 on May 22, 2008, 5:28pm »


May 22, 2008, 4:34pm, astock5000 wrote:

What about the Circle?
The Circle and H&C are one line in timetabling, crewing and trains. So any decision regarding the H&C also applies to the Circle.
Link to Post - Back to Top  IP: Logged

District Line Driver based at Upminster. The posh end of the District.
metman
chatter
member is offline

[avatar]

A60 stock car 5057



Joined: Oct 2007
Gender: Male
Posts: 2,973
Location: Northwood-on the Met main line
 Re: 'S' Stock build commences
« Reply #26 on May 22, 2008, 5:48pm »

The Circle/Hammersmith & City needs the trains more than the Met. With the signalling delayed the Met doesn't want fewer seats in the short/med term!
Link to Post - Back to Top  IP: Logged

I love my A stock I do!
astock5000
member is offline

[avatar]

A60 stock DM 5000 at Harrow on the Hill.



Joined: Mar 2008
Gender: Male
Posts: 1,677
Location: Garston, Hertfordshire
 Re: 'S' Stock build commences
« Reply #27 on May 22, 2008, 6:27pm »


May 22, 2008, 5:28pm, Jim wrote:

May 22, 2008, 4:34pm, astock5000 wrote:

What about the Circle?
The Circle and H&C are one line in timetabling, crewing and trains. So any decision regarding the H&C also applies to the Circle.

That's what I thought, but couldn't the Circle be run as part of the District? It wasn't always run with the H&C.
Link to Post - Back to Top  IP: Logged

A stock - The best trains on LU (in my opinion).

http://www.youtube.com/astock5000
Jim

member is offline

[avatar]



Joined: Feb 2005
Gender: Male
Posts: 2,117
Location: WB-EB-WB-EB-Home
 Re: 'S' Stock build commences
« Reply #28 on May 22, 2008, 7:47pm »


May 22, 2008, 6:27pm, astock5000 wrote:

May 22, 2008, 5:28pm, Jim wrote:
The Circle and H&C are one line in timetabling, crewing and trains. So any decision regarding the H&C also applies to the Circle.

That's what I thought, but couldn't the Circle be run as part of the District? It wasn't always run with the H&C.
It could be, but the District would need more drivers, all drivers would need road training on the north side of the Circle and the H&C to Hammersmith as most trains end up at Hammersmith Depot, all drivers would need C stock training (currently, East end drivers don't work C stock). All this costs money.
Link to Post - Back to Top  IP: Logged

District Line Driver based at Upminster. The posh end of the District.
metman
chatter
member is offline

[avatar]

A60 stock car 5057



Joined: Oct 2007
Gender: Male
Posts: 2,973
Location: Northwood-on the Met main line
 Re: 'S' Stock build commences
« Reply #29 on May 22, 2008, 8:41pm »

It is best that the H&C and Circle stay combined!
Link to Post - Back to Top  IP: Logged

I love my A stock I do!
« Page 2 of 3 » Jump to page   Go    [Search This Thread][Send Topic To Friend] [Print]

Google
Webdistrictdave.proboards.com
Click Here To Make This Board Ad-Free


This Board Hosted For FREE By ProBoards
Get Your Own Free Message Boards & Free Forums!
Terms of Service | Privacy Policy | Report Abuse | Mobile