 AuthorTopic: Northern Line Upgrades (Read 3,728 times)
rob
chatter
member is online

[avatar]

hop on, hop off. The way it should be.



Joined: Jun 2006
Gender: Male
Posts: 1,099
Location: North London
 Northern Line Upgrades
« Thread Started on Jul 9, 2008, 1:00am »

I attended the LURS meeting, with the speaker being Jeff Ellis who is the General Manager of the Northern Line.

He spoke mostly about the upgrade programme and the timetabling improvements recently introduced.

Some interesting points:


  • If Stepping back is reintroduced at Morden, it would be done at South Wimbledon so that the problems of 3 platforms and stepping back are reduced.
  • The 95ts has been extensively troubleshooted over the last few months with doors being the primary concern. He said that door failures due to bearings and seals (which couldn't cope with the dirt and grime that the Northern has (the same type of door system is used on the cleaner Jubilee Line!)
  • The AC Motors are in good condition and don't need any attention (having been Central line chief before, I expect he's relieved he's on the Northern for this particular aspect!)
  • The electronic proving devices to prove that equipment covers are closed (i.e. under seat equipment) has been changed. Fewer covers now have the Maglocks as the driver won't need to look under a lot of the seats. The covers only used in depots have been screwed down.
  • A proposal to extend the Mill Hill East service to East Finchley and then to Highgate Depot as they need a staff train to convey staff to the new control centre.
  • The new control centre has been built at Highgate (to nuclear bunker standards apparently!).
  • TBTC conversions will commence with Brent Cross to Colindale soon which will be a Dual Fitted Area to test the equipment (though he was relieved that the Train Control system would be thoroughly tested by the Jubilee Line before it reaches the Northern!)
  • The signalling desks at Coburg Street will be progressively transferred to Highgate Control Centre and eventually when enough of the line is converted the Line controllers will transfer to Highgate. This will leave Euston as a signal cabin essentially. (Apparently the Northern and Victoria are taking bets on who will turn out the lights at Coburg Street!)
  • The timetables have been significantly improved lately. He was very pleased to show us the contrast between the two graphs showing train lateness and train sequences between the two timetables!
  • The Regulators/Signallers at Coburg Street were told by an American consultant that they were doing everything wrong! (not well received by the signallers who had been there for decades!) The procedures have been changed so that regulation doesn't happen at Camden Town nor will it happen when the train is more than a third through its journey.
  • New crew depots are to be constructed at High Barnet and Edgware. Edgware will absorb some operators from Golders Green and High Barnet is being built for the extra train operators required for the ATO.
  • For the second Northern Line Upgrade (see below), there is a possibility that Highgate Depot may be converted back to a maintenance depot to increase flexibility.
  • The TBTC will have a platform bias (unlike the Programme machines!). For example, if there are no trains at High Barnet and the train comes in, it will be signalled into platform 1, so that passengers don't have to go miles over the footbridge.
  • Mr Ellis seemed to want to promote common sense. For example he wanted stock movements for maintenance to be done in passenger service. He has also implemented a protocol with Tubelines where the LU staff aren't so hostile to the contractors and vice versa. Apparently 200 contractors turned up at Camden Town and were refused entry as the weren't on a particular form! Another example is JNP demanding a suspension of the service in the morning peak for a signal fault. LU refused this and this started an argument between the infraco and LU. There are now ways that it will delay the service less. The infraco is required to check all equipment from the platform (in the relay room) and only after that will the Technical Officer be allowed to go onto the track. He is allowed to go in the front of the train and to have a few minutes at the signal. If he can't fix the fault then, he goes round until enough of the relevant managers are on the platform so that a suspension can be implemented to repair the fault.
  • A technical officer has been allocated to Kennington at last. (There wasn't an officer before as LU couldn't find him an office!)
  • He talked about the Northern Line Upgrade 2 and the proposal to split the line. He reckons that up to 36tph could be operated if the line was split. A new fleet of trains would be required. The split, as with most things relating to the Northern Line (and LUL !) would most probably be a political issue as well as an operational issue! (He had to fight the MPs to have the northbound split during the AM peak, but now he can boast the 98% miles operated figure!)
  • Work has begun at Tottenham Court Road for the station expansion. The current stage is to divert services (he said that every telephone cable in London passes under Oxford Street and Tottenham Court Road!). Eventually the station will be prepared for current traffic and Crossrail.
  • Camden Town can't happen until 2013 when money becomes available. The station would be in a JLE style.
  • Clapham Common to Kennington is overloaded by 600%. He despairingly said that the Clapham's island platform would have to be done in similar style to Angel/Euston, and quoted the figure of £125million. Camden would probably cost £95million.
  • He shook his head at the Battersea proposal! He knew nothing of it until last week. He cited the cost as prohibitive.



He finished by saying that although people have said that the Northern had operated 100 trains in the peak before, they rarely ever did.

Anyway, that's just a few things that he went through during the talk. Sorry to go on but a lot of it is very interesting!
Link to Post - Back to Top  IP: Logged
mrfs42
Global Moderator
*****
member is offline

[avatar]

Big Hair Day



Joined: Mar 2007
Gender: Male
Posts: 3,677
Location: Rakaia - Rangitata
 Re: Northern Line Upgrades
« Reply #1 on Jul 9, 2008, 1:18am »

The procedures have been changed so that regulation doesn't happen at Camden Town nor will it happen when the train is more than a third through its journey.



Was he talking in terms of time elapsed or distance travelled?

The TBTC will have a platform bias (unlike the Programme machines!).


Hmm. Either this is a reference to 'preferred routing' as in that used by NET (Nottingham Trams) or the information contained in the PM installation signalling notices is now plainly wrong. However, the point about terminal station platform bias is a useful one - and bears future interest with crossover clearance times.

he goes round until enough of the relevant managers are on the platform so that a suspension can be implemented to repair the fault.


Hmm.

An interesting exposition. One to watch, I feel.



Link to Post - Back to Top  IP: Logged

[image]
sweek
member is offline

[avatar]



Joined: Oct 2006
Posts: 275
Location: London NW1
 Re: Northern Line Upgrades
« Reply #2 on Jul 9, 2008, 9:01am »

Very interesting indeed. Especially more news about the split and the Mill Hill East extension.
Link to Post - Back to Top  IP: Logged
pmrnorthern
member is offline



[icq] [yim] [msn] [aim]

Joined: Oct 2007
Gender: Male
Posts: 278
Location: Mostly Middlesex
 Re: Northern Line Upgrades
« Reply #3 on Jul 9, 2008, 9:10am »


Jul 9, 2008, 1:00am, rob wrote:


  • Mr Ellis seemed to want to promote common sense. For example he wanted stock movements for maintenance to be done in passenger service.



Does that mean Antheas and the like?
Link to Post - Back to Top  IP: Logged
ducatisti
member is offline





Joined: Apr 2008
Gender: Male
Posts: 348
 Re: Northern Line Upgrades
« Reply #4 on Jul 9, 2008, 9:11am »

Grrr... the split...
Wish I'd been to that.
Having struggled through Camden Town tube this am them all the High Barnet branch trains were going to the City and all the Edgeware ones to Charing X, the platform times are seriously slow. No-one's told me how they are going to manage to get x extra tph when each city train on Camden drops off c1/3rd capacity and takes on 2/3rds capacity and the CharingX ones do the opposite. You could add addtional cross-passages I assume, but you can't make the train doors any bigger or do anything about the peeps who got on at Barnet having to squeeze through the train to get off.
Link to Post - Back to Top  IP: Logged
pmrnorthern
member is offline



[icq] [yim] [msn] [aim]

Joined: Oct 2007
Gender: Male
Posts: 278
Location: Mostly Middlesex
 Re: Northern Line Upgrades
« Reply #5 on Jul 9, 2008, 9:35am »

If they still want to split in any way, to make it a 100% split is not good. Whenever there is a problem necessitating using Camden Town platforms and passages to overcome it, the station itself quickly becomes overloaded.

Perhaps, with a little improvement at intermediate terminating points, they could make it possible for people to reach the branch they want first, even if they then have to wait for the next through train.
Link to Post - Back to Top  IP: Logged
cetacean
Guest
 Re: Northern Line Upgrades
« Reply #6 on Jul 9, 2008, 10:07am »

Why would a split Camden Town be any different from any other interchange station on the network? There are no direct trains from, say Brixton to Bond Street, and Green Park seems to cope. Why is High Barnet to Charing Cross a special case?
Link to Post - Back to Top  IP: Logged
DrOne
member is offline

[avatar]



Joined: Aug 2007
Gender: Male
Posts: 169
 Re: Northern Line Upgrades
« Reply #7 on Jul 9, 2008, 10:09am »


Jul 9, 2008, 1:00am, rob wrote:

  • The timetables have been significantly improved lately. He was very pleased to show us the contrast between the two graphs showing train lateness and train sequences between the two timetables!
  • He talked about the Northern Line Upgrade 2 and the proposal to split the line. He reckons that up to 36tph could be operated if the line was split. A new fleet of trains would be required. The split, as with most things relating to the Northern Line (and LUL !) would most probably be a political issue as well as an operational issue! (He had to fight the MPs to have the northbound split during the AM peak, but now he can boast the 98% miles operated figure!)
  • Camden Town can't happen until 2013 when money becomes available. The station would be in a JLE style.
  • Clapham Common to Kennington is overloaded by 600%. He despairingly said that the Clapham's island platform would have to be done in similar style to Angel/Euston, and quoted the figure of £125million. Camden would probably cost £95million.


Some incredible figures there.

Too many passengers and not enough trains. I thought that the only thing that can be done to try and improve things is to run more tph through each branch, which requires a split and rebuilding the station. 36tph running through the bank branch would be a major step up from the current service level and might be enough to dissipate the crowds. It's a pain for people having to Change at Camden but what else can realistically be done to improve tph and reliability? It's not be the only station on the network where large numbers change from one line to another.
Link to Post - Back to Top  IP: Logged
ducatisti
member is offline





Joined: Apr 2008
Gender: Male
Posts: 348
 Re: Northern Line Upgrades
« Reply #8 on Jul 9, 2008, 10:15am »

It's something that can be done, but will it actually improve matters? Will splitting the peak southbound services help the over-capacity on the southern end? I should imgaine by the time you get all the trains through to the southern end, the worst of the peak will be over?

Also, It's more than just a pain to change at Camden, it stands a good chance of preventing them delivering the tph improvement that they are claiming is on offer, whilst making it worse for the northbound.

Assuming there are gaps in the city loop service, and given that most southern-end peeps will be going to the central destinations, lots of Euston (and any other points that allow it) Reversers would seem the best way to get more trains back south quickly.
Link to Post - Back to Top  IP: Logged
sweek
member is offline

[avatar]



Joined: Oct 2006
Posts: 275
Location: London NW1
 Re: Northern Line Upgrades
« Reply #9 on Jul 9, 2008, 10:56am »

Waht do you mean by the southern end, ducatisti? South of Kennington?

Running so many more trains would clearly improve matters, and making the lines much less complicated very much improves the reliability and possible speed. Those are very clear advantages.

If Camden Town is really re-built Jubilee style, I think this will be a great improvement to the current situation. I do wonder a bit about Kennington. How busy is that station at the moment with an effective split already?
Link to Post - Back to Top  IP: Logged
tfc
chatter
member is offline





Joined: Jun 2007
Gender: Female
Posts: 490
Location: East London
 Re: Northern Line Upgrades
« Reply #10 on Jul 9, 2008, 11:00am »


Jul 9, 2008, 1:00am, rob wrote:


[*] If Stepping back is reintroduced at Morden, it would be done at South Wimbledon so that the problems of 3 platforms and stepping back are reduced.


Pondering how this might work..........


Jul 9, 2008, 1:00am, rob wrote:

[*]The 95ts has been extensively troubleshooted over the last few months with doors being the primary concern. He said that door failures due to bearings and seals (which couldn't cope with the dirt and grime that the Northern has (the same type of door system is used on the cleaner Jubilee Line!)
[*]The AC Motors are in good condition and don't need any attention (having been Central line chief before, I expect he's relieved he's on the Northern for this particular aspect!)


Stock reliability does seem to be improving, however re. motors we're having quite a lot of problems with the PIMs (propulsion inverter module, part of the traction kit) going and it doesn't seem at this point that Alstom are entirely on top of this problem....


Jul 9, 2008, 1:00am, rob wrote:

[*]A proposal to extend the Mill Hill East service to East Finchley and then to Highgate Depot as they need a staff train to convey staff to the new control centre.
[*]The new control centre has been built at Highgate (to nuclear bunker standards apparently!).


This I have heard already. A lot of exisiting Northern line service control staff (of which I am one) are not keen on the move to Highgate because of its inconvenient location. So a staff shuttle might be one way to persuade people that the journey is feasible. Also I've heard (but haven't seen the building myself) that the new control room has no natural light.


Jul 9, 2008, 1:00am, rob wrote:

[*]The signalling desks at Coburg Street will be progressively transferred to Highgate Control Centre and eventually when enough of the line is converted the Line controllers will transfer to Highgate. This will leave Euston as a signal cabin essentially. (Apparently the Northern and Victoria are taking bets on who will turn out the lights at Coburg Street!)


As I understand it (and I may be wrong) on the Vic the signalling function will first be transferred to the new control room while the controllers remain at Cobourg St, on the Northern I believe it will be the other way round, with the control function being the first part to move to Highgate. Also it looks likely that the Vic will go first.


Jul 9, 2008, 1:00am, rob wrote:

[*] Mr Ellis seemed to want to promote common sense. For example he wanted stock movements for maintenance to be done in passenger service.



This is being done where possible - but it depends on 3 things, the move being done, the driver doing the move and also whether the train concerned is fit for passenger service. If we are moving a train from Highgate depot via Finchley Central/Euston & Kings Cross loops then across the main to Golders depot, any gain for running it in passenger service would be more than negated by the delays caused as the train has to be detrained at each reversing point. If the train is being moved by a depot driver then it wouldn't run passenger as (AFAIK) they are not licensed to run trains in passenger service, if it's being moved by a LU driver it could carry passengers. A lot of the time trains which are being stock moved are not fit for service anyway and were stopped at an out-stabling location (Edgware, High Barnet or Highgate) and are being moved back to a major depot for repair - in this case again the train could not carry passengers.
Link to Post - Back to Top  IP: Logged
mackenzieblu
chatter
member is offline

[avatar]

TLP has begun!



Joined: Jul 2007
Gender: Male
Posts: 664
Location: Zone 3 - East
 Re: Northern Line Upgrades
« Reply #11 on Jul 9, 2008, 11:02am »

Camden Town can't happen until 2013 when money becomes available. The station would be in a JLE style.

Interesting, does this mean some of the more futurist design they put out are going to be choosen then?

He talked about the Northern Line Upgrade 2 and the proposal to split the line. He reckons that up to 36tph could be operated if the line was split. A new fleet of trains would be required.

New fleet? If Camden is rebuilt then in 2013 then does this mean a new fleet around that time? Hmmmm replace the Piccadilly and Norrthern lines at the same time?

Clapham Common to Kennington is overloaded by 600%. He despairingly said that the Clapham's island platform would have to be done in similar style to Angel/Euston, and quoted the figure of £125million. Camden would probably cost £95million.


Ouch, but is that for both of the Clapham's? If so thats not as bad. Tho it does mean that the Northern is going to require major civils and alot of money in the next decade to make it suitable for the currrent traffic levels.

And did someone say that the southern part of the Northern was over supplied?

If Stepping back is reintroduced at Morden, it would be done at South Wimbledon so that the problems of 3 platforms and stepping back are reduced.


Pondering how this might work..........


I think it means that they get a train back to South Wimbledon and get off there and walk to the back of the southbound platform and set up so that when the train gets to Morden there is a driver ready to take it out straight away.
« Last Edit: Jul 9, 2008, 11:06am by mackenzieblu »Link to Post - Back to Top  IP: Logged

My Photostream @ http://www.flickr.com/photos/mackenzieblu/

Transport related blog @ http://mackenzieblu.blogspot.com/

"Ladies and Gentlemen, the Thameslink programme has now begun and WILL affect your jounery"
rob
chatter
member is online

[avatar]

hop on, hop off. The way it should be.



Joined: Jun 2006
Gender: Male
Posts: 1,099
Location: North London
 Re: Northern Line Upgrades
« Reply #12 on Jul 9, 2008, 11:08am »


Jul 9, 2008, 11:00am, tfc wrote:

Jul 9, 2008, 1:00am, rob wrote:


[*] If Stepping back is reintroduced at Morden, it would be done at South Wimbledon so that the problems of 3 platforms and stepping back are reduced.


Pondering how this might work..........


The driver of the first train will pull into South Wimbledon. A driver on the platform would jump into the back cab. If there isn't a driver ready at South Wimbledon, a manager at Morden can deal with it with time to spare as the train hasn't arrived at Morden yet. The driver of the first train will then remain on the train as it pulls out of Morden (he said that 30-second turn arounds would be feasable), and then get out at South Wimbledon. The driver would then go to the southbound platform at South Wimbledon.



Quote:

Stock reliability does seem to be improving, however re. motors we're having quite a lot of problems with the PIMs (propulsion inverter module, part of the traction kit) going and it doesn't seem at this point that Alstom are entirely on top of this problem....


He says that a team from Mitsubishi have come to assist Alstom, and that the problem has been identified.



Quote:
This I have heard already. A lot of exisiting Northern line service control staff (of which I am one) are not keen on the move to Highgate because of its inconvenient location. So a staff shuttle might be one way to persuade people that the journey is feasible. Also I've heard (but haven't seen the building myself) that the new control room has no natural light.


He showed us some pictures of the new control room. It has a six foot thick roof (which has grass on top!) and thick steel doors. Apparently there is a shutter that comes down at night so that the bats in the woods aren't disturbed. It looked a bit clinical in the pictures, but he said that they will put some pictures and plants in there to make it more lived in. The control room looked quite large as well.



Quote:
As I understand it (and I may be wrong) on the Vic the signalling function will first be transferred to the new control room while the controllers remain at Cobourg St, on the Northern I believe it will be the other way round, with the control function being the first part to move to Highgate. Also it looks likely that the Vic will go first.


He seemed to make it sound like the control function will move to Highgate at around the half way point of the new train control being introduced. One of the problems currently is that there won't be enough signallers. The signallers are shared between the Northern and Victoria and so there are economies of scale. If one line moves out they will need to have more signallers (even though they will only be signalling for a couple of years!)

« Last Edit: Jul 9, 2008, 11:12am by rob »Link to Post - Back to Top  IP: Logged
ducatisti
member is offline





Joined: Apr 2008
Gender: Male
Posts: 348
 Re: Northern Line Upgrades
« Reply #13 on Jul 9, 2008, 11:28am »

Quoting Sweek
Quote:
Waht do you mean by the southern end, ducatisti? South of Kennington?

Running so many more trains would clearly improve matters, and making the lines much less complicated very much improves the reliability and possible speed. Those are very clear advantages.

If Camden Town is really re-built Jubilee style, I think this will be a great improvement to the current situation. I do wonder a bit about Kennington. How busy is that station at the moment with an effective split already?


I do mean South of Kennington.
Running more trains would only clearly improve matters if more trains can be run. My concern is that Camden Town will need to cater for some very large numbers of people trying to squash onto already crowded trains whilst a large number of people get off. I think this is comparatviely unusual as most peak-time flows are one-way. The result is (and I await to see what research has been done on this) that dwell times at Camden will go up very steeply in peak hours. So you won't get more trains (or at least nothing like as many as you'd hope).

In terms of Kennington, I've never had the pleasure in the rush hour, but again as it's splitting one feed into two outgoings, I should imagaine it's less bad.

Talk of how the station might be re-built doesn't really alter the key problem that there are fundamental limits on how many people you can get off and on the trains in a station stop, and until I see evidence that that has been properly factored in to calculations, I don't see how the proposed benefits will materialise, or outeigh the inconvenience caused
Link to Post - Back to Top  IP: Logged
tubeprune
Founder
*****
member is offline





Joined: Aug 2006
Gender: Male
Posts: 1,279
Location: Loughborough, England
 Re: Northern Line Upgrades
« Reply #14 on Jul 9, 2008, 11:45am »

Mr Ellis seemed to want to promote common sense.
Jeff is an eminently sensible person. He and I were motormen on the same shift at Baker St (Met.) in the early 70s. He knows what goes on and he is very experienced. I'm sorry I missed the talk. Thanks for your summary Rob.

« Last Edit: Jul 9, 2008, 11:47am by tubeprune »Link to Post - Back to Top  IP: Logged

"Rules are for the guidance of wise men and the observance of fools"
Page 1 of 4 » Jump to page   Go    [Search This Thread][Send Topic To Friend] [Print]


Google
Webdistrictdave.proboards.com
Click Here To Make This Board Ad-Free


This Board Hosted For FREE By ProBoards
Get Your Own Free Message Boards & Free Forums!
Terms of Service | Privacy Policy | Report Abuse | Mobile