Post by cso on Mar 5, 2012 14:42:26 GMT
That's certainly how it looks from the trains I've seen being delivered at Risborough...
|
|
|
|
Post by Deep Level on Mar 6, 2012 20:14:06 GMT
How long now until we have more S Stock Trains than A Stock Trains? Both in London and in Service.
|
|
|
|
Post by juliang on Mar 6, 2012 20:51:15 GMT
How long now until we have more S Stock Trains than A Stock Trains? Both in London and in Service. There are about 28 S-stocks and 30 A-stocks in service, although I could be wrong
|
|
kabsonline
Best SSL Train: S Stock Best Tube Train: 92 Stock
Posts: 669
|
Post by kabsonline on Mar 6, 2012 21:03:49 GMT
It must be around that number. The chances of getting an S Stock now when waiting seems 50/50 of maybe even higher now 
|
|
|
|
Post by undergrounddriver on Mar 8, 2012 12:43:32 GMT
what are the booked return paths for the choppers?
i fancy a camera run next week....
|
|
|
|
Post by bentley67502000 on Mar 8, 2012 17:03:15 GMT
The 2 x class 20's run as followed on Tuesdays and Thursdays until 22nd March.
Neasden Depot (F) dep 11 13 Wembley Park (pfm. 1) 11 22½ FL Harrow-on-the-Hill (pfm. 4) 11/30 Rayners Lane 11/35 Ruislip 11/40 Ruislip IMR 11/41½ Ruislip Siding arr 11 42½ dep 11 48 Ruislip Depot (East end) arr 12 03 dep 12 05 Ruislip Depot (West end) 12 20 Network Rail Link arr 12 23
|
|
a60
As much as I hate to say it, I now have a lucky S Stock unit - 21067/8
Posts: 615
|
Post by a60 on Mar 13, 2012 21:35:08 GMT
I'm sure this has been asked before, but what is the situation with 21001/2 and 21099/100?
|
|
Dstock7080
Administrator
we said goodbye to R Stock, 30yrs ago
Posts: 1,949
|
Post by Dstock7080 on Mar 13, 2012 23:12:09 GMT
I'm sure this has been asked before, but what is the situation with 21001/2 and 21099/100? They have both been test trains, 21001/2 formed as 7-cars, 21099/100 as 8-cars. Both have returned to Derby being refitted as production S8s.
|
|
metman
Global Moderator
5056 05/12/1961-23/04/2012 RIP
Posts: 5,902
|
Post by metman on Mar 13, 2012 23:21:06 GMT
I heard they would be scrapped as the 2009 stock PP1/2 were?!
|
|
|
|
Post by bronzeonion on Mar 13, 2012 23:28:41 GMT
I'd hope not, as that is by far one of the most stupid things LU have done
|
|
|
|
Post by andypurk on Mar 15, 2012 10:44:21 GMT
I'd hope not, as that is by far one of the most stupid things LU have done But it's not LU making the decision, it is Bombardier. They are the company responsible for deciding to break up the prototype units and build replacements, rather than refitting the prototypes to match the production units.
|
|
|
|
Post by tubeprune on Mar 15, 2012 13:14:55 GMT
Rumour of a rough shunt at Old Dalby between two S Stock trains earlier this week. Anyone heard anything?
|
|
|
|
Post by bronzeonion on Mar 15, 2012 16:10:27 GMT
I'd hope not, as that is by far one of the most stupid things LU have done But it's not LU making the decision, it is Bombardier. They are the company responsible for deciding to break up the prototype units and build replacements, rather than refitting the prototypes to match the production units. So LU dont get a say in wether they'd like to keep the train or not?
|
|
|
|
Post by billoo on Mar 15, 2012 18:05:48 GMT
I'd hope not, as that is by far one of the most stupid things LU have done But it's not LU making the decision, it is Bombardier. They are the company responsible for deciding to break up the prototype units and build replacements, rather than refitting the prototypes to match the production units. Were any parts of the pre-production (IE - the bodywork/interior) used on the final production trains?
|
|
|
|
Post by andypurk on Mar 15, 2012 18:22:04 GMT
But it's not LU making the decision, it is Bombardier. They are the company responsible for deciding to break up the prototype units and build replacements, rather than refitting the prototypes to match the production units. So LU dont get a say in wether they'd like to keep the train or not? Probably not, if the contract is to deliver x number of units then it will be up to the manufacturer whether they wish to reuse any prototypes. It will probably be better in the long run not to have modified prototype units running together with the production fleet.
|
|