Post by The Tram Man on Aug 12, 2014 23:12:25 GMT
There are no plans to reinstate a passenger service to Ongar, but I am not aware of the main reason why the connection was reinstated. Well, that's a good enough answer for me. Personally i think it's a shame, but i guess they have their reasons.
|
|
|
Post by phillw48 on Aug 13, 2014 7:30:16 GMT
Is there a possibility of the EOR operating into Epping now that the connection has been reinstated?
|
|
|
Post by Tubeboy on Aug 13, 2014 9:32:08 GMT
I would imagine there are lots of legal hurdles to overcome before EOR stock uses Epping Station. As Epping is only two platforms, you would really need a third one to accommodate EOR services, is there space at Epping?
|
|
|
Post by norbitonflyer on Aug 13, 2014 11:12:00 GMT
I would imagine there are lots of legal hurdles to overcome before EOR stock uses Epping Station. As Epping is only two platforms, you would really need a third one to accommodate EOR services, is there space at Epping? How often is the second platform actually used at Epping? Could the two be isolated from each other for the day? (probably a weekend, when the EOR is likely to have more custom and the Central rather less than a Mon-Fri peak)
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Aug 13, 2014 12:31:38 GMT
I would imagine there are lots of legal hurdles to overcome before EOR stock uses Epping Station. As Epping is only two platforms, you would really need a third one to accommodate EOR services, is there space at Epping? How often is the second platform actually used at Epping? Could the two be isolated from each other for the day? (probably a weekend, when the EOR is likely to have more custom and the Central rather less than a Mon-Fri peak) Well, platform 1 (which is the one the old Ongar branch leads immediately into, with points connecting it to platform 2) is used very intensively, as is platform 2. Because of demand, a lot of trains throughout the day run all the way through to Epping. Looking at the WTT, taking the time around midday on Sunday, we have trains arriving: 11 37¼ (2) 11 41¾ (1) 11 48¼ (2) 11 59¼ (2) 12 03¾ (1) with very approximately 10 minute turnarounds (8 minutes, 9¼, 9, 8, 9¼, respectively). You'd never get away with making Epping one platform for the Central and I don't think it'd every be happy sacrificing its second either - not to mention all of the legal and financial issues. I mean there's 27 road - the siding outside of the station - but even then I think if you were gonna do it, you'd have to build a new platform and I really don't think there's the will or the way.
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Aug 13, 2014 16:35:19 GMT
CHT 1960 Stock and another 1960 Stock (Track Recording Train) at South Ealing flic.kr/p/oqSiUW
|
|
|
Post by phillw48 on Aug 13, 2014 16:41:13 GMT
CHT 1960 Stock and another 1960 Stock (Track Recording Train) at South Ealing flic.kr/p/oqSiUWQuite a few differences between the two units now.
|
|
|
Post by fish7373 on Aug 13, 2014 18:11:35 GMT
Hi yes a good day for the old girl on the test track passed test know for the paper work, of to ealing comman depot tommrow. thanks FISH7373
|
|
rincew1nd
Administrator
Junior Under-wizzard of quiz
Posts: 10,227
|
Post by rincew1nd on Aug 13, 2014 18:42:48 GMT
CHT 1960 Stock and another 1960 Stock (Track Recording Train) at South Ealing flic.kr/p/oqSiUWGreat photo!
|
|
|
Post by londonstuff on Aug 13, 2014 20:28:49 GMT
CHT 1960 Stock and another 1960 Stock (Track Recording Train) at South Ealing flic.kr/p/oqSiUWYou're very lucky with that photo to get those three together - I doubt anyone has ever for many many years if ever. You could probably sell that quite easily.
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Aug 13, 2014 20:31:46 GMT
CHT 1960 Stock and another 1960 Stock (Track Recording Train) at South Ealing flic.kr/p/oqSiUWYou're very lucky with that photo to get those three together - I doubt anyone has ever for many many years if ever. You could probably sell that quite easily. It really is an excellent capture.
|
|
|
Post by fish7373 on Aug 25, 2014 22:54:16 GMT
Hi update on the test track next week FISH7373
|
|
|
Post by crusty54 on Aug 26, 2014 11:19:05 GMT
Think the option last considered was a new platform on the Ongar side of the existing Epping platforms.
|
|
|
Post by fish7373 on Aug 27, 2014 16:27:05 GMT
Hi update cravens on test track next week there using a S7 stock for training not the 1960 t/stock FISH7373
|
|
|
Post by fish7373 on Aug 27, 2014 16:35:02 GMT
Friday 26 - Sunday 28 September – End of THE Tube
HI copyed and pasted from EOR website On 30 September 1994 the last tube train left Ongar Station. Now, twenty years later, we're bringing it back!
Working with the Cravens Heritage Trains, a tube train will once again be on our rails hauled by Diesel 'Schoma' locomotives. This is the first time that a 'Schoma' has hauled a passenger train - making this a truly unique event.
Alongside this, we will have Met 1 and a range of London Transport wagons to create a unique display of steam with Tube at Ongar!
Special fares apply - tickets on sale now! FISH7373
|
|
|
Post by fish7373 on Sept 15, 2014 22:14:26 GMT
HI UPDATE, 1960 is going to Ruislip depot tomorrow about 10.30 leaving Northfields depot for the move to the EOR at a later date, now I have the CTC for running to Ruislip depot. FISH7373
|
|
|
Post by roboverground on Sept 21, 2014 20:00:16 GMT
Quite an exciting week ahead, Battery Loco - Schoma-Cravens set- Schoma- Battery Loco combination Ruislip to Epping, I wonder if this will be a one off, or the start of something special with perhaps the move repeated wit the 1938 stock set ? Thanks to Fish7373 for recent updates, had a peek at your Flickr site some very interesting behind the scenes photos, thanks for sharing.
|
|