Post by goldenarrow on May 21, 2019 17:31:35 GMT
A large closure coming up over the May Bank Holiday weekend that will close the Piccadilly line West of Hammersmith (some trains will reverse at Down St) and the District line West of Turnham Green.
What work is being done?
Thanks in advance, G.A
|
|
DWS
every second count's
Posts: 2,487
|
Post by DWS on May 21, 2019 17:47:52 GMT
A large closure coming up over the May Bank Holiday weekend that will close the Piccadilly line West of Hammersmith (some trains will reverse at Down St) and the District line West of Turnham Green. What work is being done? Thanks in advance, G.A Track replacement and drainage works, up to 12 engineering trains and a tamping machine will be used.
|
|
|
Post by goldenarrow on May 21, 2019 17:51:09 GMT
A large closure coming up over the May Bank Holiday weekend that will close the Piccadilly line West of Hammersmith (some trains will reverse at Down St) and the District line West of Turnham Green. What work is being done? Thanks in advance, G.A Track replacement and drainage works, up to 12 engineering trains and a tamping machine will be used. Do you know which bits are on the way out?
|
|
DWS
every second count's
Posts: 2,487
|
Post by DWS on May 21, 2019 18:03:12 GMT
Revised District line train services: Richmond - Upminster, every 10 minutes Richmond - Barking, every 20 minutes Wimbledon - Tower Hill, every 20 minutes Wimbledon - Edgware Road, every 10 minutes Kensington (Olympia) - High Street Kensington, every 20 minutes
Revised Piccadilly line train services: Hammersmith - Cockfosters, every 10 minutes Between 13.30 and 19.30, an additional 3 trains per hour will operate between Arnos Grove and Green Park, reversing via Down Street siding.
Also Rail replacement bus and coach services.
|
|
DWS
every second count's
Posts: 2,487
|
Post by DWS on May 21, 2019 18:06:44 GMT
Track replacement and drainage works, up to 12 engineering trains and a tamping machine will be used. Do you know which bits are on the way out? No I don’t know the sections of track, seeing it’s over 3 days, must be a large job, best look on Twitter on the days as they put up photos of the work being done.
|
|
|
Post by MoreToJack on May 21, 2019 18:19:33 GMT
Ballast track renewal works at Acton Town, track and drainage works between Boston Manor and Osterley, and step-free access work at Sudbury Town.
Obviously there's nowhere else between Hammersmith and Acton to turn the service around.
|
|
|
Post by Dstock7080 on May 21, 2019 18:30:56 GMT
eastbound local, Acton Town-Chiswick Park is definitely being replaced
|
|
|
Post by goldenarrow on May 21, 2019 18:55:11 GMT
MoreToJack , Thankyou Dstock7080 , Ah, yes I've seen that map a good may times over the numerous contingency meetings LU have been having with various departments at Heathrow. Best part of eight to twelve months went into planning for the additional coach and bus movements around the Heathrow Central and peripheral complexes.
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on May 21, 2019 19:54:05 GMT
Moat of the heavier works used to be done on Saturday nights. Now with night tube obviously something has to give to get the bigger jobs done.
With only approx 2 hours of track access during Sun to Thurs nights you can appreciate not alot in real terms get done hence the need for closures like this
|
|