Post by metrider21 on Oct 3, 2021 13:30:22 GMT
Hello everyone, I wondering where can i find details of the current transplant fleet? I was recently reading about the new wagons coming in from China.
regards M.
|
|
class411
Operations: Normal
Posts: 2,747
|
Post by class411 on Oct 3, 2021 13:49:20 GMT
Hello everyone, I wondering where can i find details of the current transplant fleet? I was recently reading about the new wagons coming in from China.
regards M.
I don't even know what the 'transplant fleet' is, and Google isn't much (any) help.
|
|
|
Post by metrider21 on Oct 3, 2021 13:52:15 GMT
Hello everyone, I wondering where can i find details of the current transplant fleet? I was recently reading about the new wagons coming in from China.
regards M.
I don't even know what the 'transplant fleet' is, and Google isn't much (any) help. Its the current LUL engineering fleet.
|
|
|
Post by Colin D on Oct 3, 2021 15:36:22 GMT
|
|
rincew1nd
Administrator
Junior Under-wizzard of quiz
Posts: 10,286
|
Post by rincew1nd on Oct 3, 2021 16:54:21 GMT
Hello everyone, I wondering where can i find details of the current transplant fleet? I was recently reading about the new wagons coming in from China.
regards M.
I don't even know what the 'transplant fleet' is, and Google isn't much (any) help. Putting "transplant" into the forum search, this was one of the first hits: Engineering department within LU responsible for the fleet of battery powered locos/trains aswell as a plethora of other engineering capabilities carried out either in house or in conjunction with appointed contractors such as Balfour Beatty. From a vague memory I believe their are based around Ruislip Depot and Acton works following the Earls Court Redevelopment project affecting Lillie Bridge Depot.
|
|
class411
Operations: Normal
Posts: 2,747
|
Post by class411 on Oct 3, 2021 17:21:31 GMT
I don't even know what the 'transplant fleet' is, and Google isn't much (any) help. Putting "transplant" into the forum search, this was one of the first hits: Engineering department within LU responsible for the fleet of battery powered locos/trains aswell as a plethora of other engineering capabilities carried out either in house or in conjunction with appointed contractors such as Balfour Beatty. From a vague memory I believe their are based around Ruislip Depot and Acton works following the Earls Court Redevelopment project affecting Lillie Bridge Depot. Unfortunately, the forum search is (usually) so utterly useless that I went straight to Google. In this particular instance that would appear to have been a sub-optimal decision.
|
|
|
Post by lul on Nov 13, 2021 21:01:25 GMT
Transplant run 29 battery locos 3 07 tampers. Currently only 1 used 1 08 p & c tamper 2 b45 tampers 2 Kirov cranes 2 twin jibs (not used) 5 7.5t rail cranes (not used) S&B wagons (to be replaced with Chinese wagons eventually) although have heard the Chinese wagons are bent Rail wagons High decks Well wagons GP wagons Track recording vehicle
|
|
|
Post by spsmiler on Nov 13, 2021 23:30:35 GMT
The Chinese wagons are what?
Does that mean 'defective' and hence unusable?
Buy cheap, buy twice.
|
|
|
Post by Dmitri on Nov 13, 2021 23:58:50 GMT
The Chinese wagons are what? Curved or twisted, I think.
|
|
|
Post by jimbo on Nov 14, 2021 6:29:04 GMT
A new fleet of engineering wagons from CRRC, the world’s largest rolling stock manufacturer, await testing of prototypes. The first four prototype wagons are in the UK and undergoing final engineering works before dynamic testing can begin. They will then be joined by a further three prototype wagons to undergo infrastructure testing on the London Underground network, after which the remaining 66 wagons will enter production in China before being shipped to the UK in early 2023. [TfL Investment Programme Report - Quarter 2 2021/22 (30 May – 21 August 2021)]
"undergoing final engineering works" probably means being straightened out then! Perhaps it happened during shipment.
The Programmes & Investment Committee meeting of March 2021 learnt that in Autumn 2020 four pre-production wagons arrived in the UK from China. These were delayed due to the Chinese factory being shut during the height of the coronavirus pandemic. Testing of these four wagons for certification of safe use on LU and Network Rail infrastructure has also unfortunately been delayed. This is due to initial inspection revealing a requirement for some remediation work before dynamic testing can commence. Subsequent contract negotiations and arranging of representation from China to physically inspect the wagons (including periods of quarantine upon arrival in the UK) has significantly delayed the milestone of commencing full production of the remaining 69 wagons, planned for this year.
|
|
|
Post by shunterl44 on Jun 28, 2022 12:10:06 GMT
The first four of the new wagons (BW001, BW002, FW001 & FW002) have recently arrived at The Chinnor & Princess Risborough Railway from Eastleigh where there had some 'rectification work' undertaken - I have heard loose bolts mentioned. The four vehicles have been fitted with sensors by Data Acquisition & Testing Services Ltd. (D.A.T.S.) and they are monitoring the performance of the wagons while running up and down the line. They need to accumulate 1200 km of running for the tests prior to LU accepting them.
The train has D.A.T.S.'s HST power (43 066) at one end and Chinnor’s Class 37 (37 227) at the other.
The tests will be running weekdays for the next couple of weeks.
|
|
|
Post by xtmw on Jun 28, 2022 19:08:17 GMT
I'm sure I saw one in Woodford sidings not too long ago
|
|
|
Post by jimbo on Jun 29, 2022 1:28:15 GMT
The first four of the new wagons (BW001, BW002, FW001 & FW002) have recently arrived at The Chinnor & Princess Risborough Railway from Eastleigh where there had some 'rectification work' undertaken - I have heard loose bolts mentioned. ..... Since: It seems to me around 20 months is a long time to fix some loose bolts!
|
|
|
Post by brigham on Jun 29, 2022 7:57:18 GMT
"..... in Autumn 2020 four pre-production wagons arrived in the UK from China. ....."
Am I the only one asking 'why?'?
|
|
Tom
Administrator
Signalfel?
Posts: 4,199
|
Post by Tom on Jun 29, 2022 21:47:46 GMT
"..... in Autumn 2020 four pre-production wagons arrived in the UK from China. ....." Am I the only one asking 'why?'? Because CRRC won the contract. Why else?
|
|
|
Post by brigham on Jun 30, 2022 7:40:11 GMT
Ah, the Thatcher legacy.
I always forget...
|
|