Post by Oracle on Apr 1, 2007 21:56:09 GMT
I won't repeat what was alleged to have been the cause of the incident. It would not be circumspect to do so on this *bows low in deference* premium-rated forum! I am not sure that it has been referred to here so
|
|
towerman
My status is now now widower
Posts: 2,970
|
Post by towerman on Apr 5, 2007 20:04:12 GMT
112 has now been moved to the lifting shop,looks like a local repair job.
|
|
towerman
My status is now now widower
Posts: 2,970
|
Post by towerman on Apr 10, 2007 21:08:45 GMT
032-031 now stopped for ATO mods.
|
|
towerman
My status is now now widower
Posts: 2,970
|
Post by towerman on May 4, 2007 18:52:58 GMT
028-027 now on DCA,032-031 jumpered up on 38rd,looks like it will be going on DCA next week.
|
|
|
Post by stanmorek on May 4, 2007 19:16:09 GMT
I've noticed these yellow vertical poles springing up trackside around the Stanmore branch. Anything to do with ATO?
|
|
towerman
My status is now now widower
Posts: 2,970
|
Post by towerman on May 5, 2007 20:27:26 GMT
I belive it is,but can't find the TC that had the blurb about them in.BTW 028-027 now off the DCA.
|
|
|
Post by abe on May 6, 2007 7:21:56 GMT
TC12/2007 p3. Is the posting of scans here permitted?
|
|
Colin
Advisor
My preserved fire engine!
Posts: 11,348
|
Post by Colin on May 7, 2007 4:05:43 GMT
TC12/2007 p3. Is the posting of scans here permitted? Not directly from the traffic circular - this thread refers. You can however type out a general overview of the text in your own words.
|
|
towerman
My status is now now widower
Posts: 2,970
|
Post by towerman on May 8, 2007 17:56:26 GMT
118-117 now stopped for ATO mods.
|
|
towerman
My status is now now widower
Posts: 2,970
|
Post by towerman on May 10, 2007 19:08:34 GMT
According to EWSA 20 the 3 car 96TS unit 96064 is returning to SMD from Highgate Depot test track on Wednesday night 16/5/07.
|
|
|
Post by citysig on May 10, 2007 20:57:05 GMT
Let's not forget the testing of some of the ATO/Transmission Based Train Control kit between Canons Park and Kingsbury this Saturday and Sunday night.
I can't forget it - I'm the one setting the signals for said tests to be carried out. I shall have so little time to read through the new rule books ;D
|
|
|
Post by stanmorek on May 10, 2007 21:50:25 GMT
Re: Reply#124
On closer inspection the yellow "poles" happen to be 3x3 timbers painted bright yellow and tied to the cable run. They appear to be markers of some sort.
|
|
|
Post by citysig on May 11, 2007 18:16:16 GMT
I would imagine that they are almost definately related to the TBTC project. There isn't anything else happening in that part of the world that we know of - though of course we are normally the last to know.
Having said that, we have been issued with information on how the system will work. It's labelled "Service Controllers" information, but appears to be mostly a "Train Operators Information" with a different label, but it's more than we'd usually get so...
The section between Canons Park and Kingsbury goes "live" from around September.
Sure I've said this elsewhere - maybe even in this thread but it has grown too long for me to have time to search back. Aplogies if I'm repeating what has already been said.
|
|
DWS
every second count's
Posts: 2,487
|
Post by DWS on May 11, 2007 19:13:02 GMT
The section between Canons Park and Kingsbury goes live from around September. Which September ;D I hear the project is running late
|
|
|
Post by citysig on May 12, 2007 1:14:21 GMT
;D The project as a whole is running late, but this bit is relatively straight forward and is said to be more or less on time (there are no controlled signals/points etc within the area they are taking.
Besides I did say "around" September so we'll see.
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on May 12, 2007 5:55:59 GMT
September 2061, of course! ;D When the section between Canons Park and Kingsbury goes live, will the traditional signalling remain in place or will it be removed? EDIT: Also, when will the physical earthworks at Stanmore be completed?
|
|
|
Post by cetacean on May 12, 2007 17:02:16 GMT
So how many trains are done now, and do they all need to be done before ATO can start?
|
|
|
Post by citysig on May 12, 2007 17:55:20 GMT
When the section between Canons Park and Kingsbury goes live, will the traditional signalling remain in place or will it be removed? EDIT: Also, when will the physical earthworks at Stanmore be completed? For quite some period of time (though don't ask me how long) the two systems will run side by side. From the point of view of our equipment, we won't (shouldn't ) notice any change in operation. At some point in the future, when the section has proved itself, the traditional signalling will be removed - this will no doubt be after the line has transferred to Neasden signal box. Stanmore's platform work has been reduced to a go slow as there is now no need to rush to complete it, as the area will be re-signalled and transferred to Neasden in one hit in around 18 months- 2years.
|
|
towerman
My status is now now widower
Posts: 2,970
|
Post by towerman on May 12, 2007 21:21:33 GMT
Trains done so far 028-027 044-043 048-079 070-069 all in service but still as conventional trains 032-031 waiting testing on DCA 118-117 in work 112-111 done,but waiting repairs on 112 unit after it's mishap. 064-063 done,but on test track at Highgate,064 due to return next Wednesday night.
|
|
towerman
My status is now now widower
Posts: 2,970
|
Post by towerman on May 19, 2007 22:35:32 GMT
032-031 now signed off,100-099 stopped for ATO mods,063 unit due to return from test track at Highgate Wednesday night.
|
|
towerman
My status is now now widower
Posts: 2,970
|
Post by towerman on May 31, 2007 19:55:58 GMT
064-063 now on DCA.
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on May 31, 2007 22:20:27 GMT
When the section between Canons Park and Kingsbury goes live, will the traditional signalling remain in place or will it be removed? EDIT: Also, when will the physical earthworks at Stanmore be completed? For quite some period of time (though don't ask me how long) the two systems will run side by side. From the point of view of our equipment, we won't (shouldn't ) notice any change in operation. At some point in the future, when the section has proved itself, the traditional signalling will be removed - this will no doubt be after the line has transferred to Neasden signal box. Stanmore's platform work has been reduced to a go slow as there is now no need to rush to complete it, as the area will be re-signalled and transferred to Neasden in one hit in around 18 months- 2years. There are articles on Alcatel's website about how Seltrac can interface with conventional signalling for non-equipped trains. www1.alcatel-lucent.com/tas/then go to TASbits (on the left side menu) Download issues 7,8, and 9 which should be of interest. (Note the website hasn't been updated lately as Thales took over Alcatel's signalling division)
|
|
towerman
My status is now now widower
Posts: 2,970
|
Post by towerman on Jun 1, 2007 4:22:06 GMT
I spoke too soon,064-063 is now off the DCA.
|
|
towerman
My status is now now widower
Posts: 2,970
|
Post by towerman on Jun 25, 2007 21:52:00 GMT
118-117 now on DCA.
|
|
towerman
My status is now now widower
Posts: 2,970
|
Post by towerman on Jun 26, 2007 21:36:06 GMT
092-091 Now stopped for ATO mods.
|
|
towerman
My status is now now widower
Posts: 2,970
|
Post by towerman on Jul 1, 2007 7:20:03 GMT
118-117 now off the DCA,battery locos & schomas are coming Monday to take a 4 car to the test track at Highgate Tuesday night,don't know which unit yet.
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Jul 1, 2007 7:58:20 GMT
So what percentage of the 96TS fleet have now had the ATO modifications?
|
|
towerman
My status is now now widower
Posts: 2,970
|
Post by towerman on Jul 1, 2007 18:01:32 GMT
10 trains out of a fleet of 63.BTW,all the first 9 are going to be retrofitted with modified wiring.
|
|
towerman
My status is now now widower
Posts: 2,970
|
Post by towerman on Jul 4, 2007 19:54:47 GMT
118 transferred to test track at Highgate,should have been 117 but Alstom day shift DDM cocked up,117 will probably go next week.
|
|
towerman
My status is now now widower
Posts: 2,970
|
Post by towerman on Jul 11, 2007 0:18:27 GMT
117 unit now left SMD,will arrive at Highgate Wednesday night/Thursday morning.
|
|