Post by dazz285 on Sept 28, 2015 19:21:32 GMT
|
|
|
Post by dazz285 on Sept 2, 2015 20:53:08 GMT
cheers
|
|
|
Post by dazz285 on Sept 2, 2015 20:17:04 GMT
So how did the Twitter chat go??
|
|
|
Post by dazz285 on Aug 10, 2015 22:10:54 GMT
You think that's funny... Try driving the 378 when an alarm goes of then the computer screen comes to life to explain to you that "Ice Mode is Recommended" when it 80+ degrees outside ;-)
|
|
|
Post by dazz285 on Jul 28, 2015 8:08:55 GMT
Due to signal sighting problems for our 5 car units we are unable to use platform 5 at Richmond hence the reason why platform 3 is in use. I believe that once the new signal in platform 5 has become live & signed off it shouldn't be too long before our trains start using platform 5 again.
|
|
|
Post by dazz285 on Jul 20, 2015 21:48:26 GMT
Dazz, you didn't include the shocking information about train length.... Obviously an error.. Should say 4 car totaling 80 metres.
|
|
|
Post by dazz285 on Jul 20, 2015 19:28:02 GMT
Lets just hope that this design gets tweaked along the way before production...
|
|
|
Post by dazz285 on Jul 20, 2015 19:07:55 GMT
|
|
|
Post by dazz285 on Jul 20, 2015 14:50:40 GMT
No just noisy circuit breakers, as patstonuk says.
|
|
|
Post by dazz285 on Jul 20, 2015 14:01:46 GMT
Possibly when the train goes through the neutral sections at Camden Rd & at North Pole.
|
|
|
Post by dazz285 on Jul 4, 2015 2:36:49 GMT
No
|
|
|
Post by dazz285 on Jul 3, 2015 18:20:10 GMT
twitter chat today said.. The new Aventra trains have mixed longitudinal / transverse seating ... That's the plan says Tfl.
|
|
|
Post by dazz285 on Jul 3, 2015 15:41:18 GMT
Well that went well... NOT !!!!
The new Aventra trains have mixed longitudinal / transverse seating ... That's the plan says Tfl & that was it....
|
|
|
Post by dazz285 on Jul 3, 2015 2:59:44 GMT
I believe that there are about 12 to 15 5 cars running around at the mo on the NLL.
|
|
|
Post by dazz285 on Jul 2, 2015 16:07:32 GMT
TfL have issued a press release to confirm that the contract for new trains for West Anglia, Romminster, GOBLIN and Watford DC lines has been signed with Bombardier after the end of the contract standstill period. Regrettably there is no real technical detail about the trains in the release and there has not been an accompanying release from Bombardier (yet). I've been checking the Bombardier site for days but nothing of relevance has appeared. tfl.gov.uk/info-for/media/press-releases/2015/tfl-signs-contract-with-bombardier-transportation-for-new-trainsYou & me both snoggle...
|
|
|
Post by dazz285 on Jun 25, 2015 16:40:07 GMT
2 bits of info floating around at work but nothing definite as of yet. 1. 9 month complete shut down 2. Gospel Oak to South Tottenham shut then Black Horse Rd to Barking shut.
I did email the canal river trust as I was curious about the last 2 bridges to be replaced between South Tottenham & Black Horse Rd & they replied "Network Rail have undertaken Trial Investigation works to this Bridge and are at present putting together a design package for its Replacement. Their initial Programme of works is looking to close the line down for 6 months, between July 2016 to December 2016."
|
|
|
Post by dazz285 on Jun 25, 2015 8:41:49 GMT
Sorry should have written 2 years.. Should know better than to add opinions after a night turn. ;-) Still a very tight time scale as a few of the Overground projects are way behind schedule.. ie W.E.F.O.C. & Willesden Tmd..
|
|
|
Post by dazz285 on Jun 24, 2015 21:39:56 GMT
According to Modern Railways July edition, Rail Minister Claire Perry has said that enabling works are to begin in October and the major works to begin in June 2016 with a completion date along with electric trains running by 30th June 2017. £115 million has been allocated, of which £90 million will come from the SgT and the rest from TfL although no final cost has been estimated yet. I'd like to know what electric trains they are talking about?? Surely it will take longer than a year to build & test the new whatever class Bombardier will build...
|
|
|
Post by dazz285 on Jun 22, 2015 15:56:48 GMT
Last time I drove on the Abbey I'm sure line speed was 60mph..
|
|
|
Post by dazz285 on Jun 19, 2015 20:03:11 GMT
There was a recent hint that they might have the S8 layout. Original plan was as the rest of the LOROL fleet. That's what I had read somewhere as well..
|
|
|
Post by dazz285 on Jun 19, 2015 9:57:13 GMT
snoggle.. You beat me to it.. Makes sense that Bombardier got the contract. Look forward to finding out what class etc I'm going to drive on the D.C. & Gob
|
|
|
Post by dazz285 on May 20, 2015 16:47:02 GMT
Not that I'm aware of but will ask around..
Asked around & no change to our uniform policy..
|
|
|
Post by dazz285 on Apr 29, 2015 16:10:07 GMT
Latest update on 5 cars.. 378202 378203 & 378204
Only 204 in service as the other 2 have technical problems as of 17.00 today, 29-04-15.
|
|
|
Post by dazz285 on Apr 23, 2015 11:34:43 GMT
Due to a failed train earlier today 378203 has been stepped up & is no longer running on times I had mentioned..
|
|
|
Post by dazz285 on Apr 23, 2015 8:03:16 GMT
378202 is out and about today as well as 378203 today
|
|
|
Post by dazz285 on Apr 21, 2015 15:45:19 GMT
|
|
|
Post by dazz285 on Apr 21, 2015 15:36:59 GMT
378203 was the first 5 car in service today on the North London & West London Lines. Fingers crossed it will be on the same circuit for the rest of the week, except Saturday.
|
|
|
Post by dazz285 on Apr 20, 2015 13:05:24 GMT
More info on the first 5 car in service for tomorrow.. Fingers crossed it will be the 06.12 from Camden Road to Stratford arriving at 06.31. 06.35 Stratford to Clapham 07.40 07.45 Clapham to Stratford 08.47 08.57 Stratford to Richmond 09.56 If any one wants any more times then PM me. Like I say fingers crossed....
|
|
|
Post by dazz285 on Apr 16, 2015 18:18:03 GMT
Tuesday 21st is the day penciled in for the introduction of the first two 5 cars for passenger service.
|
|
|
Post by dazz285 on Apr 7, 2015 14:45:36 GMT
Daz, I'm assuming NLL have started stopping at 5 car boards today? There's a lot of "why are the trains missing a carriage?" tweets today haha! Started on Sunday.. 2 week practice getting used to them before they remove/cover the old boards.
|
|